This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This level 3 course is focused on Manufacturing with three main activities: Assessment, Design and Management of the production.
The learning objectives are:
1. Estimate fully a product cost from its production environment, using appropriate Work Measurement Techniques.
2. Choose a production lay-out and production parameters (capacity, lead-times)
3. Manage the production operations so as to meet the demand and constraints (set-up times & overhead cost, labour).
Notes:
> Each simulation can be run for a maximum of 1 hour and represents a one month production schedule.
> The simulation will be available for 4 days and then the settings will change. In total, there will be 12 simulations to run, representing a full year of production schedule. The total assignment lasts 9 weeks.
This practice is based on the Supply Chain Immersive Learning Simulation (SCILS) and is aligned with the concepts of the Supply Chain Competency Framework of the Supply Chain Foundation.
Title: Supply Chain Manufacturing Planning
Learning Objectives:
Know how to choose the production environment (schedule, stock) so as to meet the expected demand, taking into account the production options (product mix, overtime), and constaints (capacity, lead-times, set-up times & cost, labour)